Your Stories Question: What’s up with the construction on the Parkway?

Set Text Size SmallSet Text Size MediumSet Text Size LargeSet Text Size X-Large
Share
Updated: 1/19 6:40 pm
Salina (WSYR-TV) – A lot of attention along Onondaga Lake Parkway has centered around the recently enacted restrictions on commercial vehicles, but additional work along the Parkway has prompted a new question.

Robert Michelson was driving on the Parkway the other day and noticed a lane reduction under the bridge. About a half mile of barrels lead up to the closure of the westbound right lane, he says.

The lane closure relates to bridge work being conducted by CSX. The State Department of Transportation says the rail company requested a highway work permit after the bridge inspection in early December found some significant deterioration. The closure began this past Monday and is expected to last about four weeks while crews make repairs to deteriorated steel beams on the truss bridge over the Parkway.

If you’re looking for additional information about the work, you can call CSX toll free at 1-877-TELLCSX (1-877-835-5279).

If you have any questions for the Your Stories team, call (315) 446-9900 or email YourStories@9wsyr.com.

Share
Click 'Like' for Central New York news updates:

Contact Your Stories

Do you have something you'd like the Your Stories team to check out? Contact us at YourStories@9wsyr.com or call us at 315.446.9900

Inergize Digital This site is hosted and managed by Inergize Digital.
Mobile advertising for this site is available on Local Ad Buy.